Справочник Пользователя для AEG Protect 1.150

Скачать
Страница из 64
 
 
59 
23. 
When the displays are lit as described, switch on 
your loads one after the other. When doing this, take 
care not to exceed the maximum permitted load 
capacity of the UPS systems. Also take into account 
the reserve capacities if active redundancy should 
be required. 
9.3.2 
Changes to the parallel system 
If you would like to add a UPS to the parallel system or remove 
a UPS from the parallel system, this step is always done by 
returning the UPS systems to BYPASS operating mode. 
i
 
Load supply through mains operation!  
(No UPS protection during this measure). 
First, switch off the inverters of the UPS systems one after the 
other (actuate the “OFF” pushbuttons). All UPS systems 
function in SBS/bypass operation. Check the operating state on 
the operating panels. Next, active the integrated manual 
bypasses (no. 3, p. 27/28) on the back of each UPS. To do this, 
first remove the 4 screws of the covers on the back. 
Put the mains input miniature circuit breakers of each UPS (no. 2, 
p. 27/28) to “OFF” position. Use your central external manual 
bypass to bypass the loads, i.e. activate the bypass operation and 
remove the load supply from the UPS busbar. 
The voltage of each UPS is disconnected in its low-voltage 
main distribution. You can now expand or reduce your parallel 
system. Pay attention to the jumpers “JP1” / “JP2” and the 
parallel operation cables. The subsequent start-up is carried out 
as described in chapter 9.3.1. 
i
 
If you only want to switch off a UPS in the 
parallel system, press the “OFF” pushbutton 
twice in succession to do this. In this way, 
individual UPS systems can be disconnected 
from the parallel operation busbar.