Справочник Пользователя для AEG 10000

Скачать
Страница из 58
29 
5.1 
Protection for the personnel 
Before setting up the UPS appliance and the external battery 
modules (optional accessory) check the following:  
♦  Disconnect the unit from the mains. 
♦  Protect against reconnection. 
♦  Assure for no power. 
♦  Ground an short circuit system. 
♦  Cover or seals adjacent components still under power. 
5.2 
Mains connection (general) 
To guarantee the correct operation of the UPS and the 
optional accessories it is necessary to supply the mains line 
with the respective protection.  
5.2.1 
Checklist for connectors 
The connection and grounding terminals are the same for all 
the PROTECT C. The cables are connected as follows: 
♦  Remove the cover of the terminals. 
♦  Introduce the cables from underneath resp. the rear 
into the terminals area of the PROTECT C. 
♦  Connect the protective conductor terminal (PE) at the 
marked position. 
♦  Connect the single lines on the respective terminals. 
♦  Fix the cable for strain relief to the cable connection 
bus-bar. 
♦  Check cable for perfect fit, if necessary fasten screw 
again. 
♦  Remove cable pieces, tools, screws etc. from the 
terminal panel. 
♦  Fix cover of the terminals again.