Справочник Пользователя для Mitsubishi Electronics AJ65BT-D75P2-S3

Скачать
Страница из 666
 
 
 
10 - 20 
MELSEC-A
10   ADVANCED POSITIONING CONTROL 
 
10.5 Starting advanced positioning control 
10.5.1 Starting advanced positioning control 
To execute advanced positioning control, a sequence program must be created to start 
the control in the same manner as for main positioning control.   
 
The following shows the procedure for starting the "1st point start block data" 
(regarded as block No. 7000) set in axis 1. 
 
0
RY
(n+1)0
1178
PLC
CPU
7000
2) ON
D75P2
Remote Input/output
 
Drive unit 
 
Remote registers 
Control by designated
positioning data
 
 
* When carrying out a positioning start with the
   next scan after a positioning operation is 
   completed, input signal RXn1 as an interlock
   so that the start is carried out once the RXn1
   signal turns OFF after the RY(n+1)0 signal
   turns OFF. 
 
1)
3)
Master
module
Buffer memory
RWwm
1) Set "7000" in "Positioning start No.(RWwm)".
   (This establishes that the control as "advanced positioning control" using start block data.)
2) Turn ON the start signal.
3) The positioning data set in the "1st point start block data" is started.
 
Fig. 10.2 Advanced positioning control start procedure