ADCP-75-124 • Issue B • April 2002 • Section 5: Maintenance
Page 5-14
©
 2002, ADC Telecommunications, Inc.
5.1
Scheduled Maintenance
 lists the items that require regular maintenance and the recommended maintenance
interval.
  Refer  to  the  section  specified  in  the  table  for  the  required  maintenance  or  test
procedure.
 
5.2
Remote Unit Cabinet Filter Cleaning Procedure
The
 RU cabinet filter cleans the RU intake air before it enters the cabinet. The filter should be
cleaned
 approximately once per year and more often in extremely dirty environments. If the
cabinet
 temperature gradually rises over a long period of time and there are no fan failures, it is
possible
 that the filter is dirty and requires cleaning. Use the following procedure to clean the
RU
 cabinet filter: 
1. Open
 the RU cabinet door as shown in 
.
 
2. Loosen
 the hex nuts that secure the left and right filter brackets to the cabinet door. 
3. Pull
 the filter upward and away from the cabinet door. Be careful not to damage the gasket
that
 provides the air seal. 
Table 5-9. Scheduled Maintenance
INTERVAL
ITEM
REQUIREMENT
1
 month
Battery*
Check
 float voltage.
Check
 system ambient temperature.
Check
 system float current.
6
 months
Battery*
Perform
 1 month scheduled maintenance tasks.
Check
 individual battery terminal temperature.
Check
 individual battery float voltages.
12
 months
Battery
 *
RU
 cabinet filter**
Perform
 1 and 6 month scheduled maintenance tasks
Complete
 detailed physical inspection. 
Re-torque
 terminal connections. 
Perform
 general system maintenance. 
Perform
 cabinet maintenance.
Remove
 and clean the RU cabinet filter. Refer to 
for
 the required procedure. 
24
 months
Battery*
Perform
 1, 6, and 24 month scheduled maintenance tasks. 
Test
 battery system for rated capacity. 
60
 months
HU
 Fans
STM
 Fan
LPA
 Fans
Remove
 and replace the cooling fans in the HU, STM, and 
LPA.
 Refer to specified section for the required procedures: 
HU
 see 
,
,
 and LPA see 
 
*
 Refer to the PRC-SERIES OPERATING AND FIELD SERVICE MANUAL (provided with the 
back-up
 battery system) for the specified battery maintenance procedures. 
**Though
 it is not recommended that the RU be installed in a salt-air environment, if done so, clean the 
cabinet
 filter on a monthly basis instead of on a 12 month basis. In addition, the RU should be 
inspected
 for corrosion due to salt, particularly near the fans and around the connectors. The MTBF of 
the
 RU may be impacted if the RU is exposed to salt-air.