Справочник Пользователя для Tait International Limited TBCK4A

Скачать
Страница из 144
 
TB9400 Installation and Operation Manual
Installation
77
© Tait Limited March 2015
5.2
Unpacking and Moving the Subrack
The subrack is packed in a strong corrugated cardboard carton with top and 
bottom foam cushions. To prevent personal injury and damage to the 
equipment, we recommend that two people unpack and move the subrack. 
To remove the subrack from the carton, follow the procedure illustrated in 
Caution A subrack complete with modules can weigh up to 46lb 
(21kg), or up to 53lb (24kg) complete with packaging. We recommend 
that you have another person help you unpack and move the equipment. 
The TBAA03-16 carrying handles will make it easier to move the 
equipment once it has been unpacked. If necessary, remove the modules 
from the subrack before moving it (refer to 
). In all cases follow safe lifting practices.
1.
Cut the tape securing the flaps at the top of the carton and fold them 
flat against the sides 
b
.
2.
Rotate the carton carefully onto its side 
c
 and then onto its top 
d
ensuring that none of the flaps is trapped underneath.
Figure 5.2
Unpacking the subrack
b
e
g
f
h
i
c
d