Справочник Пользователя для Checkpoint Systems Inc. EVOLVEF10

Скачать
Страница из 71
F10 Installation Manual 
                         Rev. *60          
 
16 of 71
 
 
C H A P T E R  
PHYSICAL INSTALLATION 
Chapter Outline  
This chapter offers diagrams and lists steps for physical installation of the major system hardware: 
1.  Requirements: Lists the tool and part requirements for a typical installation. 
2.  Installation Outline: Lists all of the basic installation steps as a sequence. 
3.  Cut Diagrams: How to plan/make cuts for proper installation of the antenna assembly, 
Impedance matching board, and plan/route the wiring of the coax cable. 
4.  Mounting the Electronics: How to install the electronics enclosure and power supply.  
Requirements 
Tools  
The following tools may be required for F10 system installations:  
  Arrow T-25 Staple Gun 
  Diagonal wire cutter  
  Hammer drill with 3/16” and 1/2” bits  
  Extension cord  
  Tape Measure 
  Hammer  
  Marker, Black Felt  
  Ratchet driver with 9/16” socket 
  Screwdrivers: mini, regular and #2 Phillips     
  Hacksaw 
  Utility knife  
  Wire Snake 
  Wire Strippers  
  Wrench, combination end 9/16” 
  Checkpoint Systems Field Service Diagnostic Management Software (DMS version 
1.8.31 or later version) installed on a laptop with the appropriate cables.