Parts
Quantity will vary according to system type.
18 AWG 2-conductor (STP) Power
22 AWG 4-conductor (STP) (5594) Sync
PVC cement
*DekDuct (wire chase)
*Wiremold (1500 or 2600 series)
*Wiremold anchor bolts
22 AWG 4-conductor (STP) (5594) Sync
PVC cement
*DekDuct (wire chase)
*Wiremold (1500 or 2600 series)
*Wiremold anchor bolts
Note: *Wire routing methods will vary by installation.
Installation Outline
Follow this sequence to successfully install the components and validate system operation:
1. Determine optimal antenna placement:
a. Perform a site survey now, or
b. Use the results of a previous survey.
b. Use the results of a previous survey.
2. Determine power supply requirements and the ideal location for system electronics.
3. Physically install the antenna(s).
4. Route/connect the antenna (coax cable) and applicable wiring (sync, alarm, power).
5. Install the peripherals and wire the device(s) to the electronics enclosure.
6. Configure the system using DMS.
7. Perform system specific tuning (test jump positions).
3. Physically install the antenna(s).
4. Route/connect the antenna (coax cable) and applicable wiring (sync, alarm, power).
5. Install the peripherals and wire the device(s) to the electronics enclosure.
6. Configure the system using DMS.
7. Perform system specific tuning (test jump positions).
Antenna Installation
Antenna installation and tuning is performed by trained Checkpoint personnel. You have already
determined the system model(s) and number of assemblies for install, or you recently received this
key information from a prior survey. If you are unsure of any specifics, contact Checkpoint Project
Management.
determined the system model(s) and number of assemblies for install, or you recently received this
key information from a prior survey. If you are unsure of any specifics, contact Checkpoint Project
Management.
Install the antenna(s) in the proper location(s) discovered during the site survey.
During Construction
If the floor has not been poured yet, a pre-fabricated trough can be constructed. Refer to Figures
3.3 and 3.4. In the event of a new construction, please convey the following information to the site
contractors (construction team’s foreman) or the manager responsible for pouring the concrete:
3.3 and 3.4. In the event of a new construction, please convey the following information to the site
contractors (construction team’s foreman) or the manager responsible for pouring the concrete:
• Location where antenna (s) will be placed; define a reference point (such as a door frame).
• The exact dimensions of antenna(s); provide the appropriate Floor Cut diagram(s).
• The depth, length and pathway of the 1/2” ENT Tubing (conduit), if installed ahead of
• The exact dimensions of antenna(s); provide the appropriate Floor Cut diagram(s).
• The depth, length and pathway of the 1/2” ENT Tubing (conduit), if installed ahead of
time; depth of the trench for routing the cable is 3.8cm [1.5in] deep.
After Construction
For sites where floor cuts must be made, convey the following instructions to the installing
technician. Communicate all known specifics to the installer, referring to the diagram(s). Be sure
to convey plans and instructions for the correct system type. Only provide the floor layout(s) for
required antenna configuration(s). If using a chisel, rough / uneven floor cuts may occur. Flatten
the bottom surface on which the antenna rests with either leveling sand or a layer of concrete fill.
technician. Communicate all known specifics to the installer, referring to the diagram(s). Be sure
to convey plans and instructions for the correct system type. Only provide the floor layout(s) for
required antenna configuration(s). If using a chisel, rough / uneven floor cuts may occur. Flatten
the bottom surface on which the antenna rests with either leveling sand or a layer of concrete fill.