Chapter 2 - CommissioningSystem Initial Verification
Chapter 2: Commissioning
System Initial Verification
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
BreezeCOMPACT System Manual
BreezeCOMPACT System Manual
36
2.3
System Initial Verification
After power-up, the BTS automatically starts a self-testing procedure to verify that:
The BTS has been correctly assembled and installed on site.
All BTS components are functioning properly.
The BTS is ready for commissioning. 
During the self-test, the LEDs indicate the working status of the various components.
To perform testing:
1
Verify that the BTS is connected to an AC power source. 
2
Upon completion of the internal test and boot-up (which may take up to 5 minutes), verify that the following LEDs are 
lit, as follows:
Upon power-up completion, the BTS is ready for basic network definition.
Table 16: BreezeCOMPACT LEDs
Name
Description
Functionality
PWR Power 
indication
Off: There is no 4*V to the internal main power supply module.
Red: Power is provided to the unit and the internal main power supply 
module is OK.
Green: All the internal digital power supply rails are OK.
ALRM
Alarm indication
Lights at power-up. 
Turns off after power-up is complete.
Lights on runtime in case of critical failure.
GPS
GPS status indication
Lights at power-up.
Turns off after power-up is complete.
Lights when the GPS is reporting at least four satellites or more reception.
Blinks (0.5 seconds on, 0.5 seconds off) when the number of satellites 
decreases from 4 to 3 or 2 satellites or the minimum configured value.
Turns off when only one satellite is received, or the minimum configured 
value for GPS is not operational or not installed.
Lights again when the unit is regaining satellites reception of 4 satellites or 