Site requirements  12 
Utilities 
Consider the proximity to required utilities, such as power, water, and network connections. While the 
required utilities can be brought to nearly any selected site, there is the potential for increased costs and 
decreased efficiency when the HP POD 20c is located farther from the utility sources. 
For utility clearance information, see "Dimensions and clearances (on page 
)." 
 
Humidifier water supply 
The HP POD 20c requires supply water for the humidifier. The supply water must meet the following 
requirements. 
 
Requirement   
Specification 
Pressure 
Between 20 and 110 psi, 0.1 and 0.8 MPa 
Temperature 
Between 1º and 40°C (33º and 104°F) 
Minimum flow rate 
1.45 lpm (0.12 gpm) 
Connection 
1.9 cm (.75 in) G 
Adapter to 1.9 cm (.75 in) FPS 
Hardness 
No greater than 40°fH (equal to 400 ppm of CaCO
3
Conductivity 
100 to 1250 μS/cm 
Organic compounds 
None 
Type of water 
Drinking water. Do not use de-mineralized or softened water. 
Instant water fill flow 
rate 
0.6 lpm (0.16 gpm) 
Humidifier 
For the exact requirements, see the humidifier documentation. 
  
 
IMPORTANT:
  If your water is out of range, consult a water quality expert. 
In addition to the previous requirements, observe the following requirements and recommendations: 
 
Do not treat the water with softeners. Softeners can produce foam, which affects the operation of the 
unit. 
 
Do not use well water, industrial water, water from cooling circuits, or water contaminated by any 
chemicals or bacteria. 
 
Do not add potential irritants to the water, such as disinfectants or anti-corrosive compounds. 
 
The manufacturer recommends installing an in-line filter for the water supply. It is your responsibility to 
determine if a filter should be installed, and if so, its location. The filter cannot be installed inside the HP 
POD 20c and must be compatible with the type of humidifier that is installed. 
For more information, see the Operations and Maintenance Manual or the HP Performance Optimized 
Datacenter 20c
 Maintenance and Service Guide. 
 
Drainage 
 
Requirement 
Location 
Specification 
Condensate drains 
Hot aisle side (2) 
3.18 cm (1.25 in) drain line and 26.5 lpm (7 gpm) max 
Chill Water Header drains  Cold aisle side (2) 
3.18 cm (1.25 in) drain line and 26.5 lpm (7 gpm) max