Справочник Пользователя для Lucent Technologies Release 8.2

Скачать
Страница из 524
Overview 
3  
C-LAN Administration
Administration for Network Connectivity
CID: 77730
555-233-504 — Issue 1 — April 2000
56
Configurations
The task descriptions are presented in six relatively simple configurations. Each 
configuration describes how to administer either a 2-switch connection or a 3-switch 
gateway connection. The procedures for administering these configurations can be 
used either individually or in groups as “building blocks” for constructing most 
networks involving DEFINITY ECS R8 and pre-R7 switches.
The following table lists the configurations described in this chapter. 
The first 2 configurations are simple 2-switch networks. The next two are 3-switch 
networks with Switch 1 serving as a gateway between different signaling types for 
connection 1 and connection 2. The last two configurations are ppp–ethernet 
networks; 5B, is the same as 5A except the Switch 1 has two C-LAN boards instead 
of one.
10  
Signaling group administered
~
page 1 — Trunk board address and Interface ID
~
Page 2 — Administered NCA TSC assignment
11  
Synchronization plan administered
12  
Trunk groups assigned
13  
Dial plan administered
14  
Uniform dial plan administered
15  
AAR analysis administered
16  
Route pattern administered
17  
Hunt groups assigned
Checklist Item
3 of 3
Config-
uration
Switch
2
Connection 
1
Switch
1
Connection 
2
Switch
3
Page
1
R7si
ppp
R7r
2
R7csi
ethernet
R7r 
(+CMS)
3
si
bx.25
R7r
ethernet
R7si
4
csi
isdn
R7si
ppp
R7csi
5A
R7csi
ppp
R7r
ethernet
R7si
5B
R7csi
ppp
R7r
(2 C-LAN 
boards)
ethernet
R7si