Oritron ICS-2100 用户手册

下载
页码 288
5 • Service
Doc. 065291-01 3/09
119
6. If you are installing new cartridges 
(P/N 045994) in the existing check valve 
housings, place the cartridge in the inlet 
check valve housing with the double-hole 
end of the cartridge visible and place the 
cartridge in the outlet housing with the 
single-hole end visible. 
NOTE The pump will not operate
properly unless the cartridge is
installed in the housing in the
correct orientation. Liquid flows
through the check valve in the
large single hole and out the
small double holes. 
7. Install the inlet check valve assembly (P/N 045722) on the bottom of the 
primary pump head. Install the outlet check valve assembly (P/N 045721) on 
the top of the head. Tighten the check valves fingertight, and then use a 
wrench to tighten an additional one-quarter to one-half turn. 
8. Reconnect the liquid lines. Turn on the ICS-2100 main power.
9. Open the eluent valve from the ICS-2100 Control panel in Chromeleon or 
select 
Eluent Valve Closed
 on the touch screen 
PUMP
 page.
11. When the ICS-2100 is at operating pressure, check for leaks from the check 
valves. Tighten a check valve a little more only if it leaks.
Cleaning Check Valves
1. Carefully remove the check valve cartridges from the valve housings.
2. Place the check valve housings and cartridges in a beaker with methanol. 
Sonicate or agitate the parts for several minutes.
3. Rinse each check valve housing and cartridge thoroughly with filtered 
deionized water.
4. To reinstall the check valves and complete the procedure, see 
 through 
 above.
Overtightening may damage the pump head and check valve housing
and crush the check valve seats.
Inlet
Check
 
Valve
Check
Outlet
 
Valve
 
Double-hole
 
Single-hole