Oritron ICS-2100 用户手册

下载
页码 288
ICS-2100 Ion Chromatography System
120
Doc. 065291-01 3/09
5.7
Replacing a Pump Piston Seal and Piston Rinse Seal
A damaged seal allows leakage past the piston, as well as leakage from the 
piston seal wash housing. The pump may be difficult to prime, flow rates may 
be unstable, and there may be baseline noise.
Preparation
1. Rinse the pump flow path with deionized water. Direct the flow to waste by 
opening the waste valve on the secondary pump head (see 
). T
open the valve, turn the knob one-quarter to one-half turn counterclockwise.
2. After rinsing, close the waste valve.
3. Close the eluent valve from the ICS-2100 Control panel in Chromeleon or 
select 
Eluent Valve Closed
 on the touch screen 
PUMP
 page.
4. To prevent contamination of pump parts, put on a pair of rubber gloves before 
disassembling the pump head.
Removing the Head and Piston
1. Turn off the main power switch, to ensure that you do not unintentionally start 
the ICS-2100.
2. Disconnect all tubing connections to the pump head.
3. Locate the open-end wrench (P/N 014605) provided in the ICS-2100 Ship Kit 
(P/N 064375). Use the wrench to remove the two acorn nuts (see 
from the pump head.
4. Slowly pull the head and allow it to separate from the housing. Carefully 
disengage the head from the piston by pulling the head straight off and away 
from its mounting studs.
Lateral motion while disengaging the pump head from the piston may
break the piston.
Un mouvement latéral pendant la séparation de la tête et du piston
peut casser le piston.
Vermeiden Sie Seitwärtsbewegungen, wenn Sie den Kopf vom Kolben
lösen. Andernfalls kann der Kolben brechen.