Moen 4200 用户手册

下载
页码 4
LAVATORY FAUCETS
Four-Inch Centerset
4200, 4220, 4330, 4340, 4350,
4400, 4641, 4643  SERIES
INSTALLATION  INSTRUCTIONS
THESE INSTRUCTIONS MUST BE
LEFT WITH HOMEOWNER
MT123A
®
CAUTION:
Always turn water off before disassembling the valve.  Open valve handle to alleviate water
pressure to insure that complete water shut-off has been accomplished.
Before turning water on during either rough-in or trim-out, make sure that the cartridge retainer clip is in place.  The cartridge and
retainer clip were properly installed and tested before leaving the factory.  Although it is unlikely, it is nevertheless possible that
through the handling of the valve by any number of persons the retainer clip may not be properly installed.  This should be carefully
checked at time of rough-in and trim-out.  If the retainer clip is not properly installed, water pressure could force the cartridge out
of the casting.  Personal injury or water damage to the premises could result.
Clip
Ear
6" X 2" WIDE
1/2" IPS
THREADED
CONNECTIONS
LIFT ROD
POSITION
USE SPACER TO INSTALL
ON THINNER LAVATORY
BOWLS OR COUNTERS
DISCARD SPACER WHEN 
INSTALLING ON THICKER
LAVATORY BOWLS OR COUNTERS
1-3/4"
MAX.
4-3/4"
3-5/8" C.C.
1-3/4"
5" NOMINAL
OPEN
POSITION
5" NOMINAL
OPEN
POSITION
CONCENTRIX HANDLE
HANDLE INSERT
(NOT
INCLUDED)
3-5/8" C.C.
1-3/4"
3-5/8" C.C.
1-3/4"
5" NOMINAL
OPEN
POSITION
LEVER HANDLE
KNOB HANDLE
TILT BACK
CLAMP BAR
With clamp bar, spacer and 
mounting nut installed, tilt 
clamp bar back as shown, 
then drop faucet supplies 
down through deck holes and 
tighten from below.  On decks 
thicker than 3/4" you may 
have to remove spacer.
Fits 4" centers and through a 1" minimum diameter hole.
All models equipped with a Moen Flow-Rator™.  
Complies with ASME A112.18.1M and CSA B125