Husqvarna CTH151 用户手册

下载
页码 48
8
ASSEMBLY
FIG. 4A
FIG. 4B
TO INSTALL BAGGER COM 
PO NENTS TO 
TRAC TOR  (See Figs. 4A-4D)
•      Remove discharge chute from rear of tractor.  Unhook  
the two (2) straps and pull chute out and away from 
tractor.
•      Remove the two (2) 3/8 nuts and fl at washers from the 
bolts at the tractor back plate.
•      Using the nuts and fl at washers removed from tractor 
back plate, install the bagger support tube to the back 
plate as shown. Tighten securely.
•     Install the two upper support brack 
ets through the 
back plate and to the  chas sis, using the 10 x 19 mm 
(3/8"x3/4") carriage bolts and locknuts sup plied. Tight en 
se cure ly.
•      Assemble both support brackets to the outside of the 
baggger support tube using two each 3/8 x 63,5mm 
hex bolts13/32" I.D. fl at washers and 3/8 locknuts from 
parts bag. Tight en securely.
•      Replace discharge chute into rear opening of tractor.  
Secure the chute with the two hook straps.
02277
DISCHARGE  
 
CHUTE
3/8 NUT 
FLATWASHER
02330
SUP PORT  
TUBE
FLAT 
WASHER
3/8 NUT  
BOLT  
FIG. 4C
02590
3/8 LOCK NUT
3/8 LOCK NUT
SUPPORT BRACKET
13/32 FLAT 
WASHER
3/8 HEX BOLT 
3/8 CAR RIAGE BOLT
FIG. 4D
02306
HOOK
BACKPLATE
SLOT
DIS CHARGE
CHUTE
NOTE: The strap hook must go through the discharge chute 
only. Do not allow the hook to enter the slot in the tractor 
back plate. This will allow the dis charge chute to fl oat with the 
mower deck when moving on uneven terrain.
0259
2
LOWER 
BAGGER 
TUBE
FRONT BAGGER TUBE
1/4 X 2"
CARRIAGE 
BOLTS
1/4 LOCK 
NUT
FIG. 5
TO ASSEMBLE BAGGER (See Figs. 5 & 6) 
NOTE:  For ease of assembly, you may wish to obtain the 
assistance of another person when putting the bagger 
to geth er.
•      Holes in front bagger tube are at an angle. Place front 
bagger tube against lower bagger tube and check for 
proper hole alignment before assembling bolts.
•      Assemble front and lower bagger tubes using four (4) 
1/4 x 50,8mm carriage bolts and lock nuts supplied. 
Tighten se cure ly.
•     Slide front and lower bagger tube assembly into the 
bagger assemby.
•      Assemble front and upper bagger tubes using four (4) 
1/4 x 50,8mm carraige bolts and lock nuts supplied. 
Tighten se cure ly.
•         Start the engine. After engine has started, move throttle 
control to idle position.
•      Release parking brake.
•      Slowly move the mo tion control lever for ward and slowly 
drive tractor off skid.
•      Apply brake to stop trac tor, set parking brake and place 
motion con trol lever in neutral po si tion.
•      Turn ignition key to "OFF" position.
Continue with the in struc tions that follow.