Powermatic PJ-882 用户手册

下载
页码 144
 
10
Installing Switch Arm 
1.  The switch arm was shipped in horizontal 
position. Loosen and remove the four socket 
head cap screws and flat washers on the 
bracket of the switch arm (Figure 3) with a 
5mm hex wrench. Hold on to the switch arm 
while doing this, to prevent the arm from 
falling. 
2.  Place the switch arm in vertical position, as 
shown in Figure 3, and align the four holes 
in the bracket with the four holes in the 
jointer stand.  
3.  Re-insert the four socket head cap screws 
with the four flat washers, as shown in 
Figure 3.  
4.  Firmly tighten the four socket head cap 
screws with the hex wrench. 
Installing Cutterhead Guard 
  Jointer knives are extremely 
sharp. Use caution when working with or 
around the cutterhead.
 
The cutterhead guard has a spring tension 
mechanism which must be properly tensioned 
when installing the cutterhead guard on the 
machine.  
To install the cutterhead guard: 
1.  Insert a small hex wrench, or similar object, 
into the pin on the guard tension mechanism 
(Figure 4). 
2.  Twist the hex wrench and pin clockwise, as 
shown in Figure 5, and hold them there. 
3.  Lower the shaft of the guard into the hole on 
the jointer’s rabbeting ledge. See Figure 6. 
The guard should be lowered into the hole 
far enough that the groove in the guard’s 
shaft will mate with the shaft of the locking 
handle (Figure 6). 
4.  After the guard has been inserted into the 
hole, let go of the guard with your left hand - 
the guard will swing toward the fence.  
5.  Completely tighten the set screw (Figure 6), 
while continuing to hold the hex wrench and 
pin with your right hand. 
6.  When the guard is secured, remove the hex 
wrench from the pin. Slightly loosen the set 
screw (Figure 6) until the pin snaps back 
against the rabbeting ledge. 
7.  Re-tighten the set screw (Figure 6). 
 
 
 
Figure 3 
 
Figure 4 
 
Figure 5