Lucent Technologies R5SI 用户手册

下载
页码 2643
DEFINITY Enterprise Communications Server Release 5
Maintenance and Test for R5vs/si  
555-230-123  
Issue 1
April 1997
Maintenance Object Repair Procedures 
Page 10-776
ISDN-LNK (ISDN-PRI Signaling Link Port) 
10
NPE Crosstalk Test (#6)
The NPE Crosstalk Test verifies that this port’s NPE channel talks on the selected 
time slot and never crosses over to time slots reserved for other connections. If 
the NPE is not working correctly, one-way and noisy connections may be 
observed. This test is usually only part of a port’s Long Test Sequence and takes 
about 20 to 30 seconds to complete. This test runs only if the Processor Interface 
link corresponding to this ISDN-LNK MO is busied out by system technician. The 
Processor Interface link number can be determined from the 
Communication-Interface Links form.
1.
D = Destructive; ND = Nondestructive
Table 10-217.
TEST #6 NPE Crosstalk Test 
Error 
Code
Test 
Result
Description/ Recommendation
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1000
ABORT
System resources for this test are not available. The ISDN-PRI link 
may be up and servicing calls. First obtain the ISDN-PRI link number 
(lnk-no) from the Communication-Interface Links form by issuing the 
display communication-interfaces links
 command. Then, 
determine the status of the ISDN-PRI link via the 
status link lnk-no
 
command. If the link is in-service, this test aborts. Therefore, to run 
this test, the link must be busied out. No new ISDN-PRI calls can be 
made while the link is in the busied-out state.
1. If the test must be run, busyout the link.
2. Retry the command.
1001
ABORT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals a maximum of 5 times.
1002
ABORT
The system could not allocate time slots for the test. The system may 
be under heavy traffic conditions or it may have time slots 
out-of-service due to TDM-BUS errors. Refer to TDM-BUS (TDM Bus) 
Maintenance to diagnose any active TDM-BUS errors.
1. If the system has no TDM-BUS errors and is not handling heavy 
traffic, repeat the test at 1-minute intervals a maximum of 5 times.
Continued on next page