Viking 855 用户手册

下载
页码 16
SECTION  TSM
685.2
ISSUE
C
PAGE  12 OF  16
Series MD2-B and MD2-C, All Sizes
DANGER !
follow these directions exactly to avoid injury 
to self or damage to the pumping unit. Be care-
ful to keep the inner and outer magnets at least 
(1) foot apart until step 4. Do not engage the 
magnets in any other fashion.
1.
  Inspect the magnets for any steel objects, which may be 
attached. Remove any foreign material. 
MD2-B Couplings:
Mount the outer magnet assembly. Locate the outer 
magnet assembly per dimension 
(See figure 18). 
MD2- C Couplings:  
Units using a NEMA C-face frame motor will require 
an adaptor plate. Mount the adaptor plate to the 
motor if it was removed. Mount the outer magnet 
assembly. Locate the outer magnet assembly per 
dimension 
(See figure 18). 
Apply Loctite® and tighten the setscrews onto the motor 
or bearing carrier key and shaft.
2.   If the bracket is not fastened to a base, clamp it down.  
Mount the motor or bearing carrier to the bracket.  Reach 
in and rotate the magnets by hand to make sure there is 
no interference. If rubbing occurs check the dimension 
in 
figure18 or contact the factory.
3.  Check to make sure the pump rotates freely by turning 
the inner magnet assembly. Inspect the magnet to make 
sure  it  has  not  picked  up  any  foreign  particles,  which 
could damage the pump. Make sure the canister O-ring 
is in good condition and in place. Place the canister onto 
the pump and press on until the canister is in contact 
with the pump mounting flange.
4.  Use a fully threaded M10X120mm capscrew (jackscrew) 
to  guide  the  canister  into  the  bracket.  Thread  the 
capscrew  all  the  way  into  the  bracket  as  shown  in 
figure Sequence 19.  Use an overhead hoist to support 
the pump if possible while guiding  the canister into the 
bracket opening.  
CAUTION !
Do  not  place  fingers  onto  the  front  of  pump 
mounting  flange. Align  the  canister  into  bore 
of the bracket and gently slide it in. When the 
magnets  start  to  engage,  the  unit  will  finish 
engagement on its own very rapidly unless the 
M10x120mm capscrew is properly used. Make 
sure fingers are not on the front of the pump. 
See figure Sequence 19.
  
Carefully  back  out  the  capscrew  while  guiding  the 
canister  into  the  bracket.    Secure  the  pump  to  the 
bracket with four 12mm capscrews.  
 
5.   Be certain that the power supply to the pump is “Locked-
out”.  Check  that  pump  rotates  freely  by  spinning  the 
motor fan blades or the bearing carrier shaft.
DANGER!
Be  certain  that  the  driving  means  (motor, 
turbine,  engine,  etc.)  has  been  “locked  out” 
or made non-operational so that it cannot be 
started while work is being done on pump. 
fIGURE  19
PUMP AND BRACKET ASSEMBLY SEQUENCE
DO NOT PLACE 
fINGERS HER
E
4) 12mm Capscrew
DO NOT PLACE 
fINGERS HERE
M10x120 CAPSCREW
MD2-B Magnets 
(Measured from the motor face)
Motor
“A” Dimension 
(Inch)
“A” Dimension (Metric)
I.E.C. 110/112
7.73
196.4 MM
I.E.C. 132
8.53
216.5 MM
182TC/184TC
8.11
206    MM
213TC/215TC
8.49
215.7 MM
254TC/256TC
9.11
231    MM
MD2-C Magnets  
(I.E.C. Measured from motor face   
NEMA  Measured from edge of adaptor plate)
Motor
“A” Dimension 
(Inch)
“A” Dimension (Metric)
I.E.C.132
10.43
265 MM
I.E.C.160/180
11.61
295 MM
213TC-256TC
10.43
265 MM
284/286TC
10.43
265 MM
ASSEMBLY Of COUPLING
fIGURE 18
Dimensions are not the same between designs