Rite Life 394 用户手册

下载
页码 28
The film selected to monitor a given processor should 
be representative of the film used with that processor. 
Scheduling Sensitometric Control 
Every processor in use should have a separate control 
chart plotted to monitor its behavior. The more frequent 
the data points, the better the control feedback. A 
control film should be run at start-up of the processor 
and at least once a day. Use sensitometry whenever 
trouble is suspected, or a change has been made to the 
process. 
Processing Procedure 
1. 
Allow the processor 
temperature and 
chemistry to reach 
equilibrium when starting 
up the processor before 
processing film. 
2. 
Films should be processed 
immediately after being 
exposed. Any delay 
between exposure and 
processing should be 
consistent from film to 
film. 
3. 
Run a full width film for 
cleanup at start-up. 
4. 
Orient the film into the 
processor in a consistent 
manner— making sure the 
film is inserted per 
processor manufacturer's 
specification. 
 
X-Rite 
TIME: DATE:  ID 
NO: 
10 
11 
12 
13 
14 
15 
16 
17 
18 
19 
20 
21