Zebra Technologies Corporation MPACTINDR1 用户手册

下载
页码 24
Beacon Hardware Specifications and Installation
2 - 5
• Bracket mount kit see 
 (included with part number MPACT-MB2000-01-WR):
• Metal bracket 
• Two 1inch Phillips head tap screw, and two 1inch plastic wall inserts
• Phillips head screw driver for mounting the bracket (metal brackets only) to a wall
2.3.1 Installing the Indoor Style Beacon
To activate a beacon part number - MPACT-MB2000-01-WR: 
1. Activate one or more beacons by pulling the mylar strip out from inside the beacon housing. 
 shows the back of a Indoor style beacon.
Figure 2-5  Indoor Style Beacon - MPACT-MB3000-01-WR 
2. From MPact Toolbox, select a site floor plan and an unassigned position for the beacon. Refer to the MPact Location & 
Analytics Deployment Guide for information on how to install and deploy the beacon from the Toolbox.To mount the 
universal style beacon to a wall:
1. From MPact Toolbox, select a site floor plan and an unassigned position for the beacon.
2. Mount the Indoor Metal beacon wall bracket on the wall with the provided screws and plastic wall inserts:
• Bracket mount kit
CAUTION: After pulling off the last mylar strip for the group of deployment beacons, you 
have 20 seconds to associate the beacon in either offline or online mode in the Toolbox 
application. 
NOTE: When installing numerous beacons, group beacons by category configurations 
and activate the beacons prior to scanning the barcodes and associating them with 
positions in the Toolbox.