Radwin Ltd. 5XACMD3CN 用户手册

下载
页码 112
FinM Deployment Guide
Release 4.2.46
2‐13
Intra Train Handover (ITHO) Update Message
Network Guidelines
This process happens in parallel and independently from the IBHO. The background process 
consists of a continuous evaluation between the 2 on‐board TMUs, as to which can receive 
the higher throughput (regardless of which base they are connected to). 
When an ITHO occurs, an update must also be sent to the on‐board router. This update will 
refresh the switches along the new data path as to the new active TMU.
Consider 
 where it is shown that TMU‐A is connected to TBS‐1 and is ACTIVE 
(passing traffic). All traffic flows in the green path.
TMU‐B is PASSIVE. It has an idle connection to a TBS and it monitors the potential throughput, 
but does not pass traffic.
Figure 2‐9: ITHO ‐ Part 1
For Regualtor Approval Only