KVH Industries TracVisionM7 用户手册

下载
页码 31
3
Before you begin, follow these steps to make sure 
you have everything you need to complete the 
installation.
a. Unpack the box and ensure it contains 
everything shown on the Kitpack Contents 
List
. Save the packaging for future use.
b. Carefully examine all of the supplied parts to 
ensure nothing was damaged in shipment.
c. Gather all of the tools and materials listed 
below. You will need these items to complete 
the installation.
• Flat-head and Phillips-head screwdrivers
• Electric drill and 1/2" (13 mm), 5/32" 
(4 mm), and 3/32" (2.25 mm) drill bits
• 3" (80 mm) hole saw
• Socket wrenches
• 7/16" open-end wrench
• Light hammer and center punch
• Adhesive tape and scriber or pencil
• Wire strippers and terminal lug crimper
• RG-6 or RG-11 RF coax cable(s) with 
see Step 6a on page 8 to determine the 
number of cables required
• Connector installation tool (Augat IT1000 
- KVH part #19-0242)
• Satellite TV receiver and TV
• Windows® laptop PC with Windows 
HyperTerminal or KVH Flash Update 
Wizard installed
Figure 1:  TracVision M7 System Components
Antenna
Switchplate
Radome
Baseplate
Always lift the antenna by the baseplate and 
never by the radome or any portion of the 
internal antenna assembly (see Figure 1).
IMPORTANT!
Figure 2:  RF Cable Guidelines
Cable Length
Use Cable Type
<= 75 ft (23 m)
RG-6
> 75 ft (23 m)
RG-11
Figure 3:  Power Cable Guidelines
Cable Length
Use Cable Gauge
< 40 ft (12 m)
14AWG (2.5mm
2
)
40-70 ft (12-21 m)
12AWG (4mm
2
)
Inspect Parts and Get Tools
1