Toshiba HCV-1JBU Instruction Manual

Page of 30
 
Page 20 
 
MAINTENANCE 
 
 
 
Table 2 – Check Points for Periodic Inspection (cont.) 
Check 
Point 
Check Item 
Check Method 
Criteria 
What to do 
Dielectric 
Strength 
Measure 
main circuit 
Measure dielectric 
strength between 
phases and between 
circuits and ground. 
10kV AC or 14kV DC for 
1 minute. 
If breakdown occurs, 
contact Toshiba. 
Open/Close 
Operation 
--- 
Perform open/close 
operation by electric 
operation test to 
confirm the correct 
operation. 
--- 
If not normal, check 
and repair.  If 
necessary, replace 
faulty parts. 
 
 
 
Table 3 - Gap/Wipe Standard Values (contactor in new condition). 
Parts 
 
Gap 
Wipe 
Allowable Wear 
Vacuum 
Interrupter 
Normally 
energized 
type 
0.091-0.098 in. 
(2.3-2.5 mm) 
0.091-0.102 in. 
(2.3-2.6 mm) 
0.051 in. (1.3 mm) 
a-contact 
0.157±0.016 in. 
(4±0.4 mm) 
0.118±0.012 in. 
(3±0.3 mm) 
b-contact 
0.157±0.016 in. 
(4±0.4 mm) 
0.118±0.012 in. 
(3±0.3 mm) 
Auxiliary 
Switch 
Delayed 
b-contact 
0.098±0.012 in. 
(2.5±0.3 mm) 
0.177±0.020 in. 
(4.5±0.5 mm) 
--- 
 
 
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.ctiautomation.net - Email: info@ctiautomation.net