Quantum DLT-S4 Betriebsanweisung
Chapter 10 Installing an Internal Fibre Channel Tape Drive
Confirming the Installation
DLT-S4 Product Manual
87
Figure 33 Connecting the Fibre
Channel and Power Cables
Channel and Power Cables
Confirming the Installation
10
To confirm the installation, turn on the host computer.
The screens displayed at power-on contain:
• BIOS
• Operating system
• SCSI controller information
If the first screen displays host adapter and SCSI ID information
The screens displayed at power-on contain:
• BIOS
• Operating system
• SCSI controller information
If the first screen displays host adapter and SCSI ID information
indicating the drive is a Quantum product, then the installation was
successful.
If the installation was NOT successful, see
If the installation was NOT successful, see
Fibre Channel port
Detail of the empty Fibre
Channel port
Channel port