Utica Boilers UB95M-200 Installationsanweisungen

Seite von 52
                                     TABLE 1: SEA LEVEL RATINGS - NATURAL AND PROPANE GASES
Input (MBH)
(1)
Heating Capacity 
(MBH)
(1)(2)
Net AHRI Rating 
(MBH)
(1)
AFUE
(2)
Flue Diameter
Shipping Wt.
High Fire
200
182
158
92.5%
2” CPVC & 3” PVC 
284 lbs.
Low Fire
80
73
63
(1)
 1 MBH = 1,000 BTUH (British Thermal Units Per Hour)
(2)
 Heating Capacity and AFUE (Annual Fuel Utilization Efficiency) are based on DOE (Department of Energy) test procedures.
TABLE 2: 95M-200 HIGH ALTITUDE DERATE CHART
Input 
(MBH)
Altitude (In Feet)
3,000 
(2)
4,000 
(2)
5,000 
(3)
6,000  7,000  8,000
9,000 10,000
High Fire
196
192
177
174.5
172
169
168
167
Low Fire
78.4
76.8
115
113.5
112
110
109
108
1)
 Boiler Input Rate is determined at minimum vent length. The rate will decrease as vent length increases.
2)
 Parameter 17 is set to 2,250 at elevations of 2,000 feet and below.
3)
 Parameter 17 must be raised to 3,200 at altitudes or elevations of 2,000 feet and above.
• Heating Capacity indicates amount of heat available after subtracting losses up the stack. Most of this heat is available 
to heat water. Small portion is heat loss from jacket and boiler surfaces, and it is assumed this heat stays in the 
structure. 
• Net AHRI Rating represents portion of remaining heat that can be applied to heat radiation or terminal units (i.e., 
finned tube baseboard, cast iron radiators, radiant floor, etc.) Difference between Heating Capacity and Net AHRI 
Rating, called piping and pickup allowance, establishes reserve for heating volume of water in the system and 
offsetting heat losses from piping. 
• Net AHRI Ratings shown are based on piping and pickup factor of 1.15 in accordance with AHRI Standard. Net AHRI 
Rating of selected boiler should be greater than or equal to calculated peak heating load (heat loss) for building or 
area(s) served by boiler and associated hot water heating systems. Consult manufacturer before selecting boiler for 
installations having unusual piping and pickup requirements.
4 - BOILER RATINGS & CAPACITIES
5