6.1 Locating the Boiler
1. 
Place crated boiler as close to selected location as 
possible and un-crate boiler. Boiler may be moved into 
position with appliance dolly or 2 wheel hand truck. 
Insert dolly or hand truck under right hand side of 
boiler. It is possible to slide boiler for short distance on 
smooth floor or surface.
2. 
Select level location central to piping systems served 
and as close to vent and air intake terminals as 
possible.
3. 
Accessibility clearances, if more stringent (i.e. larger 
clearances) than required fire protection clearances, 
must be used for boiler installation. Accessibility 
clearances may be achieved with use of removable 
walls or partitions.
 WARNING
Fire hazard. Do not install on carpeting. Failure to 
follow these instructions could result in death or 
serious injury.
!
  
4. 
Boiler is approved for installation in closets and on 
combustible floors. Boiler shall NOT be installed on 
carpeting.
5. 
Clearances shown in Table 3 indicate required 
clearances per CSA listing. Minimum 1”  (26mm)
clearance must be maintained between combustible 
construction and each of the right, top and back 
surfaces of the boiler. Allow at least 24” (610mm) at 
front and left side and 8” (204mm) at top for servicing. 
No combustible clearances are required to venting or 
combustion air intake piping.
6. 
Install equipment in location which facilitates operation 
of venting and combustion air intake piping systems as 
described in this manual.
7. 
Advise owner to keep venting and combustion air 
intake passages free of obstructions. Both venting 
and combustion air intake piping systems connected 
to outdoors must permit flow through piping systems 
without restrictions for boiler to operate. 
8. 
Install boiler so automatic gas ignition system 
components are protected from water (dripping, 
spraying, rain, etc.) during operation and service 
(circulator replacement, control replacement, etc.).
9. 
Keep boiler area clean of debris and free of flammable 
and combustible materials, vapors and liquids.
10. 
Locate boiler where ambient room temperatures 
(minimum possible temperatures where boiler is 
installed assuming boiler is not in operation and 
therefore contributes no heat to space) are always 
at or above 32°F (0°C) to prevent freezing of liquid 
condensate.
Figure 1  - Minimum Clearances To Combustible 
Construction
8”
Boiler
Rear
Front
Right Side
Left 
Side
1” 
(26mm)
1”
(26mm)
6”  
(153mm)
0” 
(0mm)
TABLE 3: BOILER CLEARANCES
Dimension
Combustible 
Construction
Accessibility/
Cleaning
Service
Top
1” (26mm)
8” (204mm)
8” (204mm)
Left Side
1”  (26mm)
24” (610mm) 24” (610mm)
Right Side
1” (26mm)
-
-
Base
Combustible
-
-
Front
0
24” (610mm) 24” (610mm)
Back
6” (153mm)
-
-
Intake/Vent 
Piping
0
-
-
Near Boiler 
Hot Water 
Piping
1” (26mm)
-
-