Toshiba Tortilla Maker HV6FS-MLD Installationsanweisungen

Seite von 38
 
 
Page 14 
INSTALLATION 
 
 
 
 
GROUND CONNECTIONS 
 
The circuit breaker cell must be grounded in 
accordance with the requirements of the National 
Electrical Code, Article 250 or applicable local 
standards. 
 
Proper grounding 
connections must be made 
to the circuit breaker cell 
before incoming power is 
applied.
 
 
It is very important that the circuit breaker and its 
enclosure be adequately grounded to protect the 
operator from injury in the event of short circuits 
or other abnormal occurrences and to ensure 
that the metal parts of the equipment, other than 
live parts, remain at ground potential. 
 
The ground terminal is located on the left rear of 
the cell frame as shown in Fig. 13.  To make the 
ground connection, first remove the fastening M8 
hex head bolt and crimp-on terminal (provided 
with the cell) and crimp the terminal to the end of 
the ground wire.  Then, reattach the terminal 
(Fig. 14) using the same bolt previously removed 
and torque to 120-150 kgf-cm (9-11 ft-lb). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Fig. 13  Location of Ground Terminal 
 
 
 
 
 
 
 
Fig. 14  Installation of Ground Wire 
 
 
    WARNING 
CTi Automation - Phone: 800.894.0412 - Fax: 208.368.0415 - Web: www.ctiautomation.net - Email: info@ctiautomation.net