Avaya 03-300430 User Manual

Page of 2574
DS1-BD (DS1 Interface Circuit Pack)
Issue 1 June 2005
1043
 
1005
ABRT
One-Way Span test cannot be executed in the current configuration. To run 
this, the TN767E (or higher-suffixed) DS1 must be administered for 
24-channel operation. The Bit Rate field on the DS1 circuit pack 
administration screen must be set to “1.544” for 24-channel operation.
1015
ABRT
Ports on the DS1 Interface circuit pack have not been busied out to 
out-of-service.
1. Enter busyout board location to put all trunks or ports of the DS1 
Interface circuit pack into the out-of-service state.
2. Retry the command.
1039
ABRT
The DS1 Interface circuit pack is providing timing for the system. Executing 
this test could cause major system disruption.
If the DS1 Interface circuit pack needs to be tested, set the synchronization 
reference to another DS1 Interface circuit pack or to the Tone-Clock circuit 
via the following command sequence: 
1. Enter disable synchronization-switch
2. Enter enable synchronization-switch set 
synchronization location
3. Enter enable synchronization-switch
1950
ABRT
Another loop-back/span test is already executing on the DS1 board or the 
board is in a network requested loop-back mode (Line loop back or Payload 
loop back). The hardware error log will indicate whether a Customer 
Loop-Back Jack test, Far CSU Loopback test, or the One-Way Span test is 
executing or if the board is in line loop-back or payload loop-back mode. 
Only one long-duration loop-back/span test can be active at a given time. 
Thus, if a loop-back/span test is already active, that test must be deactivated 
via test ds1-loop location end-loopback/span-test in order to 
execute this test.
ABRT
Internal system error
2100
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
Table 358: Test #1214 One-Way Span Test  (continued)
Error 
Code
Test 
Result
Description / Recommendation
 2 of 4