Avaya 03-300430 User Manual

Page of 2574
FIBER-LK (Fiber Link)
Issue 1 June 2005
1255
 
System Technician-Demanded Tests: 
Descriptions and Error Codes
Always investigate tests in the following order when inspecting errors in the system. For 
example, by clearing error codes associated with the EI Out-of-Frame Query test (#238), you 
may also clear errors generated by other tests later in the sequence.
Table 433: Tests Run for an EI-to-EI Fiber Link
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
Reset Fiber 
Sequence
D/ND
1
1.  D = Destructive; ND = Nondestructive
EI Out-of-Frame Query test (#238)
X
X
ND
EI Neighbor Query test (#237)
X
X
ND
Fiber Link Reset test (#768)
X
D
Table 434: Tests Run for an EI-to-SNI Fiber Link
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
Reset Fiber 
Sequence
D/ND
1
1. D = Destructive, ND = Nondestructive
EI Out-of-Frame Query test (#238)
X
X
ND
EI Neighbor Query test (#237)
X
X
ND
Configuration audit (#759)
X
X
ND
Failure audit (#777)
X
X
ND
Fiber Out of Frame query (#989)
X
X
ND
Destructive Facility test (#757)
X
D
Off-Board Destructive Facility test (#756)
X
D
Fiber Link Reset test (#768)
X
D