Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
1386 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order they are presented. By clearing error codes associated with the 
Control Channel Loop test, you may also clear errors generated from other tests in the 
sequence.
Control Channel Loop-around Test (#52)
This test queries the circuit pack for its circuit pack code and vintage and verifies its records.
Table 486: System Technician-Demanded Tests
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
1. D = Destructive; ND = Nondestructive; CD = Conditionally destructive
Ethernet Query (#1405)
X
X
ND
Control Channel Loop test (#52)
X
X
ND
IP Update (#1371)
X
X
CD
Verify NIC options (#1511)
X
X
CD
Network Connectivity (#1383)
X
X
ND
Ping test (#1379)
X
X
ND
Short IP 2-Way Transmission test (#1505)
X
ND
Long IP 2-Way Transmission test (#1506)
X
ND
Aggregator Hardware Query (#1629)
X
x
ND
Packet Count Query (#1630)
X
X
ND
Table 487: Test #52 Control Channel Loop-around Test 
Error 
Code
Test 
Result
Description / Recommendation
None,
2100
ABRT
System resources required for this test are not available.
1. Retry the command at 1-minute intervals up to 5 times.
 1 of 2