Avaya 03-300430 User Manual

Page of 2574
PDMODULE (Processor Data Module)
Issue 1 June 2005
1763
 
Data Module Audits Test (#17)
This is a series of six tests that are classified as hardware audits. The processor sends 
messages to the on-board microprocessor to perform the following tests:
Switchhook Inquiry: This is an update of the processor’s software records based on the 
on-hook/off-hook status of the data module.
Bad Scan Inquiry: A message is sent uplink that contains a count generated by certain 
events relating to the digital loop’s (link) conditions. This could be an indication of 
communication problems between the processor and digital port board.
7
FAIL
Conference test failed on the primary information channel. In some cases, 
user may not notice disruption in service. In extreme cases, conferencing 
feature may not work at all.
14
FAIL
The primary information channel is not transmitting properly. User impact 
may range from noticing nothing to not being able to use this port.
15
FAIL
The control channel between the processor and Digital Line circuit pack is 
not transmitting properly. This can cause a wide range of effects. The 
user may notice nothing or the port may be totally unusable. This could 
also disrupt other users.
1. Run circuit pack tests to check the Tone Generator and the Tone 
Detector circuit packs using test board location short.
2. Resolve any problems that are detected on the Tone Generator 
circuit pack or Tone Detector circuit pack.
3. If the Tone Generator and Tone Detector circuit packs are functioning 
properly, and the test still fails, replace the Digital Line circuit pack.
16
FAIL
The secondary information is not transmitting properly. This can cause a 
wide range of effects. The user may notice nothing or the port may be 
totally unusable.
1. To be sure that this is not an intermittent problem, repeat this test up 
to up to 10 times to make sure it continues to pass.
2. If complaints still exist (poor data transmission), examine the data 
module, connections, and wiring.
PASS
Information and Control Channel Local Loop test passed. Every channel is 
transmitting properly.
Table 652: Information and Control Channel Local Loop Test  (continued)
Error
Code
Test
Result
Description / Recommendation
 3 of 3