Level 1 Status Inquiry Test (#621)
This test determines the state of the transmission facility of a BRI port at the Level 1 (L1) or 
physical layer.  L1 can be in one of two possible states: Activated or Deactivated.
The Activated state is the correct state for an ISDN-BRI port.  In this state the Level 1 interface 
can communicate with the BRI endpoint or ASAI adjunct administered on this port.  This test 
passes if the state of L1 is activated.  This test also passes if software has taken this port out of 
service.
1139
ABRT
The PN’s packet bus is out-of-service.
1. Follow the repair procedures for the packet bus.
2. After completing step 1, execute test port long location and 
review the results of the BRI Port Local LAN Looparound test to verify 
the repair.
1141
ABRT
The PKT-CTRL is out-of-service.
1. Follow the repair procedures for the PKT-CTRL.
2. Enter test port long location and review the results of the BRI 
Port Local LAN Looparound test to verify the repair.
2012
ABRT
Internal system error
1. Retry the command at 1-minute intervals up to 5 times.
2100
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times.
FAIL
The loop-around test has failed.
1. If the test fails repeatedly, attempt to reset the circuit pack if the other 
ports on the board are idle.  Reset the circuit pack by issuing the 
busyout board location and reset board locations.
2. If the test fails again, execute test pkt P on the management 
terminal.  If this fails, follow the failure procedures the in PKT-BUS 
section.
3. If the tests executed in step 2 pass, the problem is local to the BRI 
board.  Replace the circuit pack.
PASS
The BRI Port Local LAN Looparound test has passed.
Table 151: Test #618 BRI Port Local LAN Looparound  (continued)
Error
Code
Test
Result
Description / Recommendation
 2 of 2