Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
662 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
System Technician-Demanded Tests:
Descriptions and Error Codes
Investigate tests in the order presented.  By clearing error codes associated with the 
Looparound and Conference test (#33), you may also clear errors generated from other tests in 
the testing sequence.
NPE Crosstalk Test (#6)
The NPE Crosstalk test verifies that this port’s NPE channel talks on the selected time slot and 
never crosses over to time slots reserved for other connections.  If the NPE is not working 
correctly, 1-way and noisy connections may be observed.  This test is part of a port’s long test 
sequence and executes in about 20 to 30 seconds.
Order of Investigation
Short Test 
Sequence
Long Test 
Sequence
D/ND
1
1. D = Destructive; ND = Nondestructive
Looparound and Conference test (#33)
X
ND
NPE Crosstalk test (#6)
X
ND
Diagnostic test (#114)
X
X
ND
Audit Update test (#36)
X
X
ND
Table 224: Test #6 NPE Crosstalk Test 
Error 
Code
Test 
Result
Description / Recommendation
ABRT
Could not allocate the necessary system resources to run this test.
1. Retry the command at 1-minute intervals up to 5 times
1000
ABRT
System resources required to run test are not available.  The port may be 
busy with a valid call.
1. Use display port location to determine the trunk group/member 
number of the port.  Use status trunk to determine the service state 
of the port.  If the port is active, wait until it is idle.
2. Retry the command at 1-minute intervals up to 5 times.
 1 of 3