Avaya 03-300430 User Manual

Page of 2574
Communication Manager Maintenance-Object Repair Procedures
700 Maintenance Procedures for Avaya Communication Manager 3.0, Media Gateways and Servers
 
The Activated state is the correct state for an ISDN-BRI port.  In this state the Level 1 interface 
can communicate with the BRI endpoint or ASAI or Avaya adjunct administered on this port.  
This test passes if the state of Level 1 (L1) is Activated.  This test also passes if software has 
taken this port out of service.  See the description of the Level 1 “Deactivated State” below for 
more details.
The Pending Activation state indicates a problem with the endpoints or adjunct, the wiring to the 
sets or adjunct, or the BRI-LINE circuit pack.  When in this state, the Level 1 interface is either 
not receiving any L1 framing from the endpoint or adjunct (Endpoint Idle), or it is communicating 
with the endpoint or adjunct but cannot transition to the Activated state (Endpoint Active).
The Deactivated state indicates a problem with the BRI-LINE circuit pack.  When in this state, 
the Level 1 interface is idle and is not trying to communicate with the BRI endpoints or adjunct.  
When an ISDN-BRI port is placed in the out-of-service state, Level 1 is also put into the 
Deactivated state.  This could be due either to the system detecting a fault with the port or to a 
busyout port location request.
Table 235: Test #621 Level 1 Status Inquiry 
Error 
Code
Test 
Result
Description / Recommendation
1187
ABRT
The board, port or station may have been busied out by a technician.
1. Look in the Error Log for Error Type 18 (port busied out) for this port 
and BRI-BD (board busied out).  If this error type is present for 
BRI-PORT only, release the port via release port pp and run the 
test again.  If the error is present for both BRI-BD and BRI-PORT, then 
release the board via release port location  and run the test 
again.
Note:
Note:
When you release a port, you release every port associated 
with it.  If certain ports still need to be busied out, use port 
location
 to busy them out.
2. Make sure the terminal is connected.
3. Retry the command at 1-minute intervals up to 5 times.
4. If the test continues to abort, escalate the problem.
2000
ABRT
Response to the test was not received from the circuit pack within the 
allowable time period.
1. If the test aborts repeatedly up to five times, reset the circuit pack via 
the busyout board location and reset board location.
2. If the test aborts again, replace the circuit pack.
 1 of 4