Xerox ColorQube 9201/9202/9203 Administrator's Guide

Page of 336
Security
Xerox ColorQube™ 9201/9202/9203
System Administrator Guide
169
To Schedule On Demand Overwrite
A TCP/IP network-connected device can be set to overwrite image data on a daily, weekly, or monthly 
basis. To schedule a daily overwrite, perform the following steps.
1.
At your Workstation, open the web browser and enter the IP address of the device in the Address 
or Location field. Press [Enter].
2.
Click the [Properties] tab.
3.
If prompted, enter the Administrator User ID and Password. The default is [admin] and [1111].
4.
Click on the [Login] button.
5.
Click on the [Security] link.
6.
Click on the [On Demand Overwrite] link.
7.
Select [Scheduled] in the directory tree.
8.
In the On Demand Overwrite > Scheduled page:
a.
From the [Frequency] drop-down menu, select the frequency for the overwrite to occur.
b.
If [Daily] is selectedspecify the time for the Overwrite in [Time] (24-Hour Clock). The device 
will be taken offline each day at the time specified to perform the overwrite. 
If [Weekly] is selected, select a day in the week for [Day of Week], for [Time] specify the 
time for the overwrite to run on that day of the week.
If [Monthly] is selected, select a day between 1 and 28 for [Day of Month], for [Time] 
specify the time for the for the overwrite to run on that date of the month. 
c.
Select either [Standard] or [Full] overwrite you require for Type.
d.
Click on the [Apply] button.
e.
Click on the [OK] button when you see the message “Properties have been successfully 
modified”
.
9.
Select [Logout] in the upper right corner of your screen if you are still logged in as Administrator, 
and click on the [Logout] button.