Cisco Cisco ONS 15454 M2 Multiservice Transport Platform (MSTP)

Page of 40
Step 22
If overhead circuits exist in the amplifier or optical service channel cards installed in Side A of ROADM Node 2, complete
“DLP-G112 Delete Overhead Circuits” task in the chapter “Create Optical Channel Circuits and Provisionable Patchcords”
of the Cisco ONS 15454 DWDM Network Configuration Guide to delete these overhead circuits.
Step 23
Click the Provisioning WDM-ANS Optical Side tab.
Step 24
In the optical sides table, click the optical side corresponding to the amplifier or optical service channel cards installed in
Side A of ROADM Node 2.
Step 25
Click Delete.
Step 26
In the confirmation dialog box, click Yes.
Step 27
Click the Provisioning WDM-ANS Internal Patchcords tab.
Step 28
Look in the To column of the internal patchcords table and make a list of internal patchcords that connect the amplifier or
optical service channel cards in Side A to the 40-WSS-C/40-DMX-C card (or the 32WSS/32DMX and 32WSS-L/32DMX-L
cards) in Side B of ROADM Node 2.
Step 29
Click Delete.
Step 30
In the confirmation dialog box, click Yes.
Step 31
Remove the physical fiber and attenuators, if present, that connect the amplifier or optical service channel cards in Side
A to the 40-WSS-C/40-DMX-C card (or the 32WSS/32DMX and 32WSS-L/32DMX-L cards) in Side B of ROADM Node
2.
Step 32
If there are pluggable port modules (PPMs) that terminate on the ROADM Node 2, complete the “DLP-G280 Delete a
PPM” task in the chapter “Provision Transponder and Muxponder Cards” of the Cisco ONS 15454 DWDM Network
Configuration Guide 
to delete these PPMs.
Step 33
Complete the
to delete the amplifier
or optical service channel cards installed in Side A of ROADM Node 2.
Step 34
Complete the “NTP-G163 Upgrade Nodes in Single-Shelf Mode to Multishelf Mode” task in the chapter “Turn Up a Node”
of the Cisco ONS 15454 DWDM Network Configuration Guide to upgrade ROADM Node 1 to a multishelf configuration
and add ROADM Node 2 as a subtending shelf. The following figure shows the final multishelf view of the node.
Step 35
In the multishelf view, click the Provisioning WDM-ANS Internal Patchcords tab.
Figure 5: Final Multishelf View of the Node
32