Step 42
Click Next.
Step 43
Review the display-only information on the Internal Patchcord Origination Reverse page. This page shows the shelf, slot,
and port that CTC will use for the opposite internal patchcord origination route
Step 44
Click Next.
Step 45
Review the information displayed on the Internal Patchcord Termination Reverse page. This display-only page shows the
shelf, slot, and port that CTC will use for the reverse internal patchcord termination route.
Step 46
Click Finish. The new internal patchcord appears on the Internal Patchcord table.
Step 47
Complete the “NTP-G37 Run Automatic Node Setup” task in the chapter “Turn Up a Node” of the Cisco ONS 15454
DWDM Network Configuration Guide
.
Step 48
In node view, click the Circuits tab.
Step 49
Complete one or more of the following procedures to recreate circuits identified in Steps 4 and
Step 19, on page 31
:
• “DLP-G105 Provision Optical Channel Network Connections” task in the chapter “Create Optical Channel Circuits
and Provisionable Patchcords” of the Cisco ONS 15454 DWDM Network Configuration Guide
• “DLP-G346 Provision Optical Channel Client Connections” task in the chapter “Create Optical Channel Circuits and
Provisionable Patchcords” of the Cisco ONS 15454 DWDM Network Configuration Guide
• “DLP-G395 Create an Optical Channel Trail” task in the chapter “Create Optical Channel Circuits and Provisionable
Patchcords” of the Cisco ONS 15454 DWDM Network Configuration Guide
Cisco recommends that you recreate the circuits one at a
time.
Note
Step 50
Complete the “NTP-G60 Create and Delete Overhead Circuits” task in the chapter “Create Optical Channel Circuits and
Provisionable Patchcords” of the Cisco ONS 15454 DWDM Network Configuration Guide to recreate circuits deleted in
Step 22, on page 32
.
Step 51
Verify that each circuit appears on the Circuits table with a DISCOVERED status and an IS/Unlocked state. If not, repeat
Step 48, on page 34
and
Step 49, on page 34
.
If the circuits still do not appear with a DISCOVERED status and IS/Unlocked state, contact your next level of support.
Step 52
Click the Provisioning Pluggable Port Module Pluggable Port Module tab and click Create to recreate the PPMs
deleted in
Step 32, on page 32
.
Step 53
Complete the “DLP-G180 Clear a Manual or Force Y-Cable or Splitter Protection Switch” task in the
document for OCHNCs and/or OCHCCs that were switched to the opposite side of the ring as part of a splitter or Y-cable
protection group to return the traffic to its original condition.
Stop. You have completed this procedure.
NTP-G242 Modify the CD setting of TDC-CC and TDC-FC Cards
This procedure allows you to modify the CD settings of the
TDC-CC and TDC-FC cards.
Purpose
None
Tools/Equipment
34