Cisco Cisco Digital Service Access Node (DSAN) 8210 Installation Guide
Opening and Closing the Housing
78-4041038-01 Rev B
43
To Close the Housing
Complete the following steps to close the node housing.
CAUTION:
Avoid moisture damage and RF leakage! Follow the procedure exactly as
shown below to ensure a proper seal.
shown below to ensure a proper seal.
1 Make sure that the housing gaskets are clean and in the correct position. Wipe off
any excess dirt and debris.
2
Close the housing.
CAUTION:
Ensure that all the cables are out of the way when closing the housing.
3 Lightly secure the 8 half-inch closure bolts with a hex driver or ratchet.
4 Using a torque wrench, tighten the closure bolts to 25 in-lb (2.8 Nm).
4 Using a torque wrench, tighten the closure bolts to 25 in-lb (2.8 Nm).
Important: Tighten the closure bolts in the correct sequence as specified in
Torque Sequence (on page 43).
Torque Sequence (on page 43).
5 Using the same pattern, tighten the housing closure bolts from 5 to 12 ft-lb (6.8 to
16.3 Nm).
Torque Sequence
The following diagram shows the proper torquing sequence for closing the housing.
Use the torque settings provided in Torque Specifications (on page 39).
Use the torque settings provided in Torque Specifications (on page 39).