Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 174
 
 
Removing and Reinstalling the Optical Modules 
 
To Remove/Reinstall Dual Redundant Receiver 
Important: While performing this procedure, be sure to observe the precautions for 
handling an optical receiver. 
Complete the following steps to remove or reinstall the dual redundant receiver 
from the optical section. 
1  Open the node housing. Refer to 
To Open the Node Housing (on page 15). 
2  Remove the AC shunt power directors. 
3  Rotate the fiber management tray out of its stored position. Refer to 
To Unstow 
the Fiber Management Tray (on page 22). 
Note: Using your index finger, pull up on the fiber tray pull-tab lever and rotate 
the fiber management tray to partially expose the optical modules. 
4  Loosen the fiber connectors in the fiber management tray. 
5  Using a flat-blade screwdriver, loosen the two mounting screws. 
 
6  Pull the receiver out from the optical section. 
a  If you are not reinstalling the receiver at this time, proceed to step 10. 
b  If you are reinstalling the receiver now, proceed to step 7. 
7  Insert the receiver in the appropriate slot and ensure that the receiver is seated 
properly. 
Note: Insertion slot is labeled on the optical interface board. 
8  Use a flat-blade screwdriver to tighten the two mounting screws. 
 
OL-29644-03 
41