Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 174
Chapter 2    Installation and Configuration 
 
 
 
 
6  Pull the receiver out from the optical section. 
a  If you are not reinstalling the receiver at this time, proceed to step 10. 
b  If you are reinstalling the receiver now, proceed to step 7. 
7  Insert the receiver in the appropriate slot and ensure that the receiver is seated 
properly. 
Note: Insertion slot is labeled on the optical interface board. 
8  Use a flat-blade screwdriver to tighten the two mounting screws. 
9  Route the fiber pigtail through the fiber access slot. 
Note: Route excess fiber loosely through the fiber hold-down clips. 
 
CAUTION: 
Be careful not to damage the fiber or pigtails. 
10  Locate the proper fiber connector and connect to the fiber bulkhead adapter. 
11  Rotate the fiber management tray to its stored position. Refer to 
To Stow the 
Fiber Management Tray (on page 24). 
12  Insert the AC power shunt directors. 
Note: If supplying power to the node through the main input port, a power 
inserter must be installed to terminate the RF signal. 
13  Close the node housing. Refer to 
To Close the Node Housing (on page 15). 
 
 
 
 
 
40 
OL-29644-03