Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide
Removing and Reinstalling the Optical Modules
CAUTION:
Be careful not to damage the fiber or pigtails.
Be careful not to damage the fiber or pigtails.
11 Reconnect the fiber connector to the fiber bulkhead adapter.
12 Rotate the fiber management tray to its stored position. Refer to
12 Rotate the fiber management tray to its stored position. Refer to
To Stow the
Fiber Management Tray (on page 24).
13 Insert the AC shunt power directors.
Note: If supplying power to the node through the main input port, a power
inserter must be installed to terminate the RF signal.
14 Locate the proper fiber connector and connect to the fiber bulkhead adapter.
15 Close the node housing. Refer to
15 Close the node housing. Refer to
To Close the Node Housing (on page 15).
To Remove or Reinstall the Optical Receiver
Important: While performing this procedure, be sure to observe the precautions for
handling an optical receiver.
Complete the following steps to remove or reinstall the single receiver from the
Complete the following steps to remove or reinstall the single receiver from the
optical section.
1 Open the node housing. Refer to
1 Open the node housing. Refer to
To Open the Node Housing (on page 15).
2 Remove the AC shunt power directors.
3 Rotate the fiber management tray out of its stored position. Refer to
3 Rotate the fiber management tray out of its stored position. Refer to
To Unstow
the Fiber Management Tray (on page 22).
Note: Using your index finger, pull up on the fiber tray pull-tab lever and rotate
Note: Using your index finger, pull up on the fiber tray pull-tab lever and rotate
the fiber management tray to partially expose the optical modules.
4 Loosen the fiber connector in the fiber management tray.
5 Using a flat-blade screwdriver, loosen the two mounting screws.
5 Using a flat-blade screwdriver, loosen the two mounting screws.
OL-29644-03
39