Cisco GainMaker Optoelectronic Node 1GHz with 65 86 MHz Split Installation Guide

Page of 174
 
 
Removing and Reinstalling the Optical Modules 
 
 
CAUTION: 
Be careful not to damage the fiber or pigtails. 
11  Reconnect the fiber connector to the fiber bulkhead adapter. 
12  Rotate the fiber management tray to its stored position. Refer to 
To Stow the 
Fiber Management Tray (on page 24). 
13  Insert the AC shunt power directors. 
Note: If supplying power to the node through the main input port, a power 
inserter must be installed to terminate the RF signal. 
14  Locate the proper fiber connector and connect to the fiber bulkhead adapter. 
15  Close the node housing. Refer to 
To Close the Node Housing (on page 15). 
 
To Remove or Reinstall the Optical Receiver 
Important: While performing this procedure, be sure to observe the precautions for 
handling an optical receiver. 
Complete the following steps to remove or reinstall the single receiver from the 
optical section. 
1  Open the node housing. Refer to 
To Open the Node Housing (on page 15). 
2  Remove the AC shunt power directors. 
3  Rotate the fiber management tray out of its stored position. Refer to 
To Unstow 
the Fiber Management Tray (on page 22). 
Note: Using your index finger, pull up on the fiber tray pull-tab lever and rotate 
the fiber management tray to partially expose the optical modules. 
4  Loosen the fiber connector in the fiber management tray. 
5  Using a flat-blade screwdriver, loosen the two mounting screws. 
 
OL-29644-03 
39