Cisco Model GS7000 4-Port Node 1 GHz with 42 54 Split Installation Guide

Page of 15
 
 
 
Optional Performance Verification Following the RF Split 
Change (this step may be skipped)
 
 
Forward Path RF Verification 
1  Install the RF module into the test GS7000 Node housing. 
2  Verify the location of any AC Power shunts prior to applying AC Power. 
Note that AC Power must be connected to port with a shunt installed and the AC 
Power will be also present at all other ports with shunts installed. 
Energize the unit only after verifying the AC shunt configurations. 
 
3  Attach a network analyzer or stealth meter to output port of the RF Amp 
module (or to Forward Test Point location). 
4  Note that the amplifier gain will be approximately 42dB (or 22 dB if measuring 
at test point location) in this configuration and analyzer port power setting will 
need to be set appropriately to prevent overdriving the unit or the analyzer. 
5  Connect the cable adapter (part number GS7K-SPLKT-CBL) from the RF test 
source to the receiver input connector on the launch amplifier  that corresponds 
to applicable output port. 
 
 
 
 
WARNING: 
Potentially lethal voltages may be present inside the node. Follow
appropriate safety precautions and practices to avoid electric shock when
working inside the node.