Cisco Headend System Release 2.7 Installation Guide

Page of 60
 
 
 
Complete System Validation Tests 
 
4023373 Rev B 
39 
 
Complete System Validation Tests 
Introduction 
After you restart the cron jobs and the billing and other third-party applications, you 
must perform system validation tests. 
 
Prerequisites 
The test DHCT(s) you use for this procedure must meet the following conditions: 
 
Must be authorized for all third-party applications 
 
Must not be authorized to view a PPV event without specifically buying the 
PPV event 
 
Must have a working return path and be capable of booting into two-way mode 
 
Verifying a Successful Installation 
Complete the following steps to verify that the SARA Server software installed 
successfully. 
Important: If this procedure fails, do not continue with the remaining procedures in 
this publication. Instead, contact Cisco Services. 
1  Perform a slow-and-fast boot on a test DHCT as follows: 
a  Boot a DHCT.  
Note: Do not press the power button. 
b  Access the Power On Self Test and Boot Status Diagnostic Screen on the 
DHCT and verify that all parameters, except UNcfg, display Ready.   
Note: UNcfg displays Broadcast
c  Wait 5 minutes. 
d  Press the power button on the DHCT to power on the DHCT. 
e  Access the Power On Self Test and Boot Status Diagnostic Screen on the 
DHCT. 
f  Do all of the parameters, including UNcfg, display Ready?  
– 
If yes, go to step 2. 
– 
If no, contact Cisco Services. 
2  Ping the DHCT.