Alcatel-Lucent omniaccess safeguard controller Installation Instruction
OmniAccess SafeGuard Controller Installation Guide
31
Chapter 2: Site Preparation and Installation
To connect the SafeGuard Controller to a DC power source, follow these steps:
1
Turn off the DC power at the source.
2
Connect the DC connector on the cable to the SafeGuard Controller, as shown in
Figure 12 Connecting the DC Power Cord
3
Align and tighten the captive retaining screws at the top and bottom of the
connector.
connector.
4
Connect the other end of the DC power cable to the DC power source.
5
Turn on the DC power at the source.
Installing Small Form-Factor Pluggable (SFP) Modules
To communicate reliably over fiber-optic cables, make sure that the wavelength of each
port matches the wavelength specifications on the other end of the cable. Fiber SFP
modules inserted into odd-numbered ports should be oriented so that the send (Tx) and
receive (Rx) marks are facing up, and modules inserted into even-numbered ports should
be oriented so that the Tx and Rx marks are facing down.
port matches the wavelength specifications on the other end of the cable. Fiber SFP
modules inserted into odd-numbered ports should be oriented so that the send (Tx) and
receive (Rx) marks are facing up, and modules inserted into even-numbered ports should
be oriented so that the Tx and Rx marks are facing down.
To avoid damaging the cables, connectors, and optical interfaces, always disconnect
cables from SFP modules before inserting or removing the modules. To prevent
unnecessary wear and tear, insert or remove SFPs only when necessary.
cables from SFP modules before inserting or removing the modules. To prevent
unnecessary wear and tear, insert or remove SFPs only when necessary.
CST_025
Connector
r
etaining screws