Cisco CATALYST 6509E 9 SLOT 15U CHASSIS NO POWER SUPPLY NO FAN TRAY Specification Guide

Page of 336
4-5
Catalyst 6500 Series Switches Installation Guide
OL-5781-04
Chapter 4      Removal and Replacement Procedures
  Removing and Installing the AC-Input Power Supplies
Figure 4-3
Handling an AC-Input Power Supply
Installing a 950 W or 1400 W AC-Input Power Supply
Follow these steps to install an AC-input power supply:
Step 1
Ensure that the system (earth) ground connection has been made. For ground connection instructions, 
see the 
.
Step 2
If necessary, remove the blank power supply filler plate from the chassis power supply bay opening by 
loosening the captive installation screws.
Step 3
Grasp the power supply handle with one hand. Place your other hand underneath the power supply, as 
shown in 
Slide the power supply into the power supply bay. Make sure that the power supply 
is fully seated in the bay.
Step 4
Securely tighten the power supply captive installation screws. (See 
 for the Catalyst 6503 and 
Catalyst 6503-E switches.)
Caution
Power supply captive installation screws must be tight to ensure protective grounding continuity.
Step 5
At the front of the chassis, plug the power cord into the PEM.
63032
INPUT
OK
FAN
OK
OUTPUT
FAIL
INPUT
OK
FAN
OK
OUTPUT
FAIL