RadioFrame Networks Inc MCSERIES10 User Manual
MC-Series System Installation & Testing
System Configuration Changes
106
RadioFrame Networks, Inc.
7
Reconnect terminations to:
•
RF Shelf 2: Tx IN B and Rx OUT B
•
RF Shelf 3: Tx IN C and Rx OUT C
8
The disconnected RF shelf (or shelves) remain in the rack and must remain unpowered.
The following cables may remain as long the RF shelf remains unpowered:
Index
Part Number
From
To
Type
AL_2
820-0607-00
RF Shelf 2: ALARM
RBS: ALARM INPUT B
serial
RF_15
820-0610-30
RF Shelf 2: TX OUT
TOR: Tx 2
RF cable
RF_16
820-0610-30
RF Shelf 2: RX IN
TOR: Rx 2
RF cable
AL_3
820-0607-00
RF Shelf 3: ALARM
RBS: ALARM INPUT C
serial
RF_21
820-0610-30
RF Shelf 3: TX OUT
TOR: Tx 3
RF cable
RF_22
820-0610-30
RF Shelf 3: RX IN
TOR: Rx 3
RF cable
9
Place dust caps (RFN P/N: 546-0005-00) on cables (end not going to TOR):
•
RF Shelf 2: RF_15 and RF_16
•
RF Shelf 3: RF_21 and RF_22
10
Place dust caps (RFN P/N: 546-0003-00) on the TOR:
•
RF Shelf 2: Tx 2 and Rx 2
•
RF Shelf 3: Tx 3 and Rx 3
11
Push the new datafill load to the iSC.
12
Using the breakers on the PDU, turn up the BIC, AIC, and RBS 1 (RBS 2 and RBS 3 if
present), and then verify that the components are operational before proceeding.
present), and then verify that the components are operational before proceeding.
•
RBS: The STATUS LED for each group will light green in this order: A, B, and then C.
•
RBS: The RADIOBLADE STATUS LEDs will light red and then green for each present
RadioBlade. If no RB is present, the LED will not light. To verify the contents of the RBS,
pull out the shelf (powering off is not required) and inspect the RadioBlades and their
respective status LEDs. Reinsert the RBS. To do this, press up on one side rail locking
arm and press down on the other side rail locking arm, and then push the unit into the
rack (see the following illustration).
RadioBlade. If no RB is present, the LED will not light. To verify the contents of the RBS,
pull out the shelf (powering off is not required) and inspect the RadioBlades and their
respective status LEDs. Reinsert the RBS. To do this, press up on one side rail locking
arm and press down on the other side rail locking arm, and then push the unit into the
rack (see the following illustration).
•
BIC CRIC and AIC CRIC: The POWER and STATUS LEDs will light red and then green.
All other BIC and AIC card LEDs will light green.
All other BIC and AIC card LEDs will light green.
13
Using the breakers on the PDU, turn up RF Shelf 1 only. Do not turn up RF Shelf 2 and RF
Shelf 3 unless part of the new configuration. Verify that RF Shelf 1 is operational before
proceeding.
Shelf 3 unless part of the new configuration. Verify that RF Shelf 1 is operational before
proceeding.
The POWER and ALARM LEDs on the front of each RF Shelf will light green.