Andrew Wireless Innovations Group RPT-MR703P User Manual

Page of 59
U
SER
´
S MANUAL FOR BAND SELECTIVE REPEATERS 
MR
X
03P 
 
 
User'sManual.doc 
Id.-No.:154999 
Page 31 
22-Jan-01 
 
5.2. 
BOOT PROCESS 
 
As soon as the repeater is switched on, the control module of the repeater starts the 
boot process; LE3 displays “Power on”. The initialization of the hardware is part of 
the boot process. The whole process may take up to several minutes. 
 
After booting the system, LE1 turns red for a few moments, then flashes green. LE2 
also flashes red and then green. This is just an optical functionality test of the two-
coloured LEDs. 
 
 
figure 5-1 Control module – Position of LEDs 
 
 
Internal 
LED LE1 
Internal 
LED LE2 
Internal 
LED LE3 
Cause 
 
 
 
 
green 
Power on 
Software booting 
 
Flashes red 
for a short 
time 
 
Flashes red 
for a short 
time 
green 
LED test 
green 
 
green 
 
green 
Software boot 
successful 
table 5-1 LED indication during boot process 
 
LE3 
LE2 
LE1