Emerson HASXEE-IM-HS User Manual

Page of 502
Emerson Process Management GmbH & Co. OHG
 7-17
X-STREAM XE
Instruction Manual
HASXEE-IM-HS
10/2010
7
Maintenance & Procedures
7.4.2   Manual Calibration
7.4.2  Manual Calibration
7.4.2.1  Manual Zero Calibration
Starting from the MEASUREMENT SCREEN 
press 
down
  to  open  the  MAIN  MENU  and 
enter CONTROL.
To  start  a  zero  calibration  select  the  first 
line
:
Multi-channel unit: 
Select the channel to be calibrated in 
SELECT COMPONENT.
Before  selecting  any  further 
line  make  sure  the  required 
calibration  gas  is  applied  and 
flowing!
Supply  all  calibration  gases 
with the same flow as the samp-
le gas (recommeded approx. 1 l/
min), pressureless and utilizing 
the correct gas fitting (
 sect. 
3.4).
Ensure  the  warm-up  time  after 
switching on has elapsed! 
Warm-up time is 15 to 50 minutes 
depending on installed  measu-
ring  system and configuration!
The first line gives you the choice to cancel 
the procedure now.
Select the second line to 
start the calibra-
tion.
Control..
Zero calibration..
Span calibration..
Advanced calibration..
Apply gas..
Lock menus!
Acknowledgements
Pump 1:
Off
Pump 2:
Off
Ranges..
Ch1
Zero calibration
Cancel!
Start!
Zero gas
0.000 ppm
Concentration
0.000 ppm
Flow
0.00 l/min
Status..
Results..
Restore!