Cisco Systems 7500 Series Manual De Usuario
R E V I E W D R A F T — C I S C O C O N F I D E N T I A L
3-26
Cisco 7500 Series Installation and Configuration Guide
OL-5008-03 B0
Chapter 3 Installing a Cisco 7500 Series Router
Installing the Cisco 7513, Cisco 7513-MX, and Cisco 7576
Step 4
Replace the card cage assembly. (See the procedure in the
Step 5
Replace the power supplies. (See the
.)
Step 6
Replace the processor modules in the card cage. (See the procedure in
.) Check all ejector
levers and ensure the processor modules are securely installed; tighten any that are loose.
This completes the procedure for installing the Cisco 7513, Cisco 7513-MX, and Cisco 7576. Proceed
to the
to the
.
Attaching the Cisco 7513, Cisco 7513-MX, and Cisco 7576 Cable-Management
Bracket
Bracket
Use the following procedure to install the cable-management bracket. You will need a large flat-blade
screwdriver for this procedure.
screwdriver for this procedure.
Step 1
Locate the two slotted screws between the blower module and the card cage opening at the interface
processor end of the router. (See
processor end of the router. (See
.)
Figure 3-16
Installing the Cable-Management Bracket on a Cisco 7513, Cisco 7513-MX, and
Cisco 7576
Cisco 7576
Step 2
Loosen these two screws using the flat-blade screwdriver.
Step 3
Place the bracket over the screws, as shown in
Step 4
Tighten the screws.
122372
Loosen
screws (2)
screws (2)
Bracket
Blower
module
module
Card cage