SG Series 10, 20, 30 & 40 kVA 
7.1 
PROCEDURES FOR SINGLE UPS 
 
7.1.1 Start-up 
of 
the 
SG Series 
 
Verify with open front door: Switch Q1 and Q2 must be open (Pos. O). 
 
1.  Connect the Utility power on the UPS. 
(In case of separate inputs for Rectifier 
and Bypass, connect both). 
• 
Power supply starts up. 
Indicated with flashing alarm and 
buzzer sound
• 
LED’s as indicated will be lit. 
• 
Press mute, to reset alarm and buzzer. 
 
 
 
2.  Close Q1 (Pos. I). 
• 
Bypass Utility connects to the output. 
• 
Rectifier starts automatically, blinking 
LED indicates Soft-start. 
• 
At the end of Rectifier Soft-start, LED 
remains lit.
 
 
 
3.  Connect the Battery to the UPS by closing the Battery Switch or Fuses, in 
case of External Battery.
 
 
4. Press inverter on ( I ) key. 
• 
Soft-start of Inverter indicated with 
blinking LED
• 
At the end of Soft-start the LED 
remains lit. 
• 
Automatic transfer from Bypass to 
Inverter
• 
UPS output LED indicates Load on 
Inverter
.
 
 
The LCD must display on the main screen the status LOAD ON INVERTER
 
End of procedure 
 
 
The Battery must be charged for at least 10 hours, in order to ensure the full 
backup runtime in the case of a Utility Failure