GE 30 Manual De Usuario

Descargar
Página de 88
 
GE
 
OPM_SGS_USM_10K_40K_0US_V010.doc 
44/88 Operating 
Manual 
SG Series 10, 20, 30 & 40 kVA 
7.1.2  Maintenance shutdown (Load on Q2) 
 
Initial status: 
Load supplied from Inverter.
 
 
 
 
1. Press inverter off ( O ) key and hold 
until the LED inside the Inverter symbol 
turns OFF
. 
• 
Load is transferred to Utility
• 
Inverter shuts down. 
• 
LED Inverter must be OFF. 
 
The LCD screen must display the status LOAD ON BYPASS”.
 
 
 
2.  Close Q2 (Pos. I). 
• 
Load is now supplied parallel through 
Bypass and Q2
• 
LED for Manual Bypass lights up. 
 
 
 
3.  Open Q1 (Pos. O) and then press total 
off” button. 
• 
Load is now supplied from Manual 
Bypass
• 
Rectifier shuts down and all output and 
input contactors are opened. 
 
The LCD panel must display the main screen, indicating the status LOAD OFF.
 
 
 
4.  Disconnect the Battery from the UPS in 
case of External Battery
• 
Wait  5 minutes for DC-Link Capacitors 
discharge. 
 
 
 
End of procedure